Across a project's policies, an insurance expert witness on construction insurance assesses where a loss belongs, from contract works to liability cover. A typical scheme combines a contractors' all-risks or builder's risk policy, public or general liability held by contractor and subcontractors, professional indemnity for architects and engineers, and property or loss-of-rent cover for completed sections. Each policy has its own triggers, exclusions, deductibles and claims team. The first job is mapping which policies could respond, who holds them and in what order, and joint names, waivers and contract clauses frequently change who should claim.
A project rarely has just one insurance policy
On a typical scheme, the works may be insured under a contractors' all risks or builder's risk policy, while the main contractor and subcontractors carry their own public or general liability cover, architects and engineers hold professional indemnity insurance, and the owner may arrange property and loss of rent cover for completed sections.
Each policy has its own triggers, exclusions, deductibles and claims team. The expert's first job is therefore mapping: identifying which policies could respond to a given loss, who holds them and in which order they apply.
Joint names, waivers and the contract
A careful reading of these clauses frequently changes who should be claiming and against which policy.
The different experts involved
Insurers appoint loss adjusters to investigate, sometimes several on the same project if more than one policy is notified. Each reports to its own principal. Coverage counsel may also be involved where the wording is contested.
Their role is to coordinate the claim across policies, prepare a consistent case on cause and quantum, and avoid the situation where each insurer argues that another one should pay. Courts and tribunals may also appoint or receive independent experts if the matter escalates.
How a programme-level claim is handled
The process follows the familiar notification, investigation and adjustment stages, but with more parties and longer timelines.
- Notify every potentially relevant insurer early, even if cover seems uncertain, to protect notification conditions.
- Collect the full insurance schedule for the project, including subcontractor certificates and any wrap-up documents.
- Establish a single, documented account of the event and its cause before positions harden.
- Allocate the loss between policies: physical damage, third-party liability, design error, delay.
- Negotiate with each insurer, recording agreements so that later payments are not reopened.
Documents an expert will ask for
Beyond the policies themselves, an adviser will want the building contract and amendments, the design responsibility matrix, the programme and progress reports, payment certificates, site diaries, meeting minutes, correspondence with designers and any reports from engineers or building control. These records show who did what, when, and under which obligations.
Recurring sources of dispute in construction insurance
Construction is one of the lines where coverage arguments are most frequent, largely because responsibility is shared and policies are designed to dovetail without overlapping.
- Design exclusions in contract works policies, and whether the designer's professional indemnity cover should respond instead.
- Whether a loss is a single occurrence or several, which affects deductibles and limits.
- Contribution between insurers when two policies cover the same loss, and the risk of delay while they argue.
- Late notification, especially where a problem developed gradually during construction.
- Recovery of consequential costs such as delay, liquidated damages and finance charges, which are rarely covered under standard material damage wordings.
- Subrogation: whether the insurer, after paying, can pursue another project party who believed they were protected.
Quantum in a multi-policy claim
Valuation must be split in a way each insurer can accept: physical reinstatement under the works policy, third-party property damage under liability cover, rectification of design error under professional indemnity, and delay under any delay in start-up section. A quantity surveyor or forensic accountant often supports the expert, particularly where costs have been absorbed into general project accounts.
A clear cost allocation reduces duplicated questions, prevents gaps where no policy pays, and speeds up interim payments that keep the project solvent.
Signs you need independent representation
Independent support is most valuable when more than one insurer is involved, when the loss threatens cash flow or the project programme, when insurers are disputing between themselves, or when the in-house team lacks claims experience. On smaller, single-policy matters, a capable broker may be enough.
Check the adviser's construction track record, licensing where it applies, professional indemnity insurance and independence from the insurers involved. If agreement cannot be reached, routes include internal complaints, ombudsman schemes for eligible smaller businesses, mediation, expert determination or adjudication under the contract, and ultimately arbitration or court.
Policy extensions that may offset the cost
Construction and commercial property policies sometimes include a claims preparation costs clause, reimbursing reasonable fees of accountants or other professionals to produce information the insurer requires.
Separately, professional fees cover pays designers and engineers to plan and supervise reinstatement. It reduces the cost of the remedy but generally not the cost of negotiating the claim. Deductibles, which can be substantial on large projects, also eat into what is recovered and therefore into any percentage fee base.
Selecting an adviser and agreeing terms
Price only makes sense alongside capability. A cheaper adviser who fails to coordinate several insurers can leave money unclaimed between policies.
- Ask for comparable programme-level claims and references from contractors or owners.
- Verify licences where required, professional indemnity cover and absence of conflicts with insurers or other project parties.
- Define which policies and which parties are covered by the engagement.
- Set clear termination terms and what is owed for work done to date.
- Disregard pitches that guarantee a result or a specific multiple of the insurer's offer.
Keeping the claim organised across the project
On a construction project the claim file can quickly become unmanageable, because the contractor, the employer, the designers and several subcontractors may each hold a policy and each have an interest in the outcome. The first discipline is a single log of events: what happened, when it was discovered, who was told and which policy was notified. Notice requirements are strict, and a late or incomplete notification to one insurer can be used to reduce a claim even where the loss is plainly covered.
Alongside the log, keep the contract documents, the programme, the site diary, daily reports, photographs, delivery notes and the variation orders. These show what stage the works had reached, what had been paid for and what the loss actually interrupted. When a delay or damage event affects the critical path, a programme analysis prepared by a planning specialist is often the most reliable way to convert the delay into a sum that an insurer will recognise.
Working with brokers, adjusters and independent advisers
The broker who placed the programme is usually the first contact, and the insurer’s loss adjuster will follow. An independent claims adviser or quantity surveyor acting for the policyholder can review the adjuster’s reports, challenge the apportionment between policies and prepare the quantum. Ask what is included in the fee, who will do the work, and whether the adviser has handled a claim of similar size and complexity. For larger losses, agree a reporting rhythm so that interim payments are requested at each stage rather than waiting for a final settlement.
Organisations offering this service
- Royal Institution of Chartered Surveyors (RICS) - Find a surveyor: International professional body for chartered surveyors, offering an online search tool to locate member surveyors and regulated firms.
- Chartered Institute of Loss Adjusters (CILA): Chartered UK professional body for claims and loss adjusting professionals, responsible for training, qualifications and standards across the claims profession.
External links provided for information only; check the terms directly with each organisation.
Frequently asked questions
What is the difference between construction insurance and a building defect warranty?
Construction insurance mainly protects the parties during the works and against liability. A defect warranty or latent defects policy protects the owner after completion against hidden flaws.
Can a contractor and an owner use the same independent expert?
Sometimes, if they are joint insured and their interests are aligned. Where responsibility between them is disputed, separate advisers are safer to avoid conflicts of interest.
Does a wrap-up programme simplify claims?
It can, because a single insurer handles several covers. However, wrap-up policies have their own exclusions and deductible structures, and contractors should check what remains their own responsibility.
In construction, the main risk is not a lack of cover but cover that is spread across many hands. An expert who maps every policy at the outset gives the injured party the best chance of a complete, timely settlement.